Commercial Paving

Asphalt paving, repairs, curbs, drainage adjustments, concrete interfaces, line marking, and traffic phasing for commercial and multi-residential properties.

Asphalt paving machine placing a new road surface
23Project reference image ↗

Built around performance Details that matter

The finish is only as strong as the planning behind it.

A good paved surface depends on what is below it and where water goes. Base failure, poor drainage, utility settlement, freeze-thaw cycles, heavy traffic, thin edges, and badly detailed interfaces can quickly undo a cosmetic overlay.

Moderno coordinates investigation, removals or milling, granular and localized base repairs, asphalt placement, compaction, curbs, catch basins, concrete interfaces, line painting, signage, traffic, and phased reopening.

Applications Where we can help

Planned for real properties and real operating conditions.

Our scope Coordinated delivery

One team across the critical interfaces.

01

Assessment

Review pavement distress, elevations, drainage, traffic, utilities, curbs, catch basins, loading areas, and the cause of recurring failures.

02

Base + drainage

Remove failed areas, repair granular or stabilized base, adjust structures, correct localized grades, and resolve vulnerable edges.

03

Paving

Coordinate milling, tack, asphalt type and thickness, placement, joints, compaction, tie-ins, ramps, curbs, and quality control.

04

Marking + reopen

Allow required cooling or cure, complete line painting and symbols, reinstate signs and stops, clean the site, and reopen in phases.

Our process Clear from the start

Decisions resolved before they become site problems.

  1. 01

    Survey

    Establish quantities, distress, drainage, access, traffic, utility covers, operational needs, and repair priorities.

  2. 02

    Phase

    Plan closures, temporary routes, deliveries, accessible access, emergency service, tenant notices, and weather contingencies.

  3. 03

    Prepare + pave

    Complete removals, base and drainage repairs, milling, asphalt placement, compaction, and clean tie-ins.

  4. 04

    Mark + release

    Inspect levels and finish, complete line painting and accessories, remove controls, and reopen safely.

Technical considerations No hidden handoffs

What we resolve with the project team.

Frequently asked Practical answers

What property teams want to know.

Is an asphalt overlay enough for a damaged parking lot?

Only when the existing pavement and base are sufficiently stable and drainage is acceptable. Areas with movement, settlement, alligator cracking, or base failure usually need deeper repairs first.

Can a parking lot remain partly open during paving?

Yes. Larger properties can often be divided into phases with temporary traffic routes, access to businesses and residences, protected pedestrian paths, and clear reopening times.

When can vehicles drive on new asphalt?

The timing depends on mix, thickness, weather, compaction, loading, and the paving contractor's requirements. The project plan sets controlled reopening to protect the new surface.