Identify
Confirm dimensions, thickness, make-up, coating, tint, pattern, safety markings, spacer, framing, gaskets, and sealants.
Start a project Specialty construction Safety / clarity / performance
Replacement glazing for commercial windows, storefronts, curtain walls, entrances, and interior partitions, including safe temporary protection and perimeter seals.

Built around performance Details that matter
Broken, fogged, scratched, or poorly performing glass affects safety, comfort, energy use, appearance, and water control. The replacement must match the opening, edge clearances, coatings, tint, safety classification, and surrounding framing system.
Moderno coordinates measurements, make-safe work, temporary boarding, glass identification, procurement, access, removal, setting materials, gaskets, sealants, cleaning, and final inspection for active commercial properties.
Applications Where we can help
Insulated-glass unit replacement
Storefront and curtain-wall glazing
Commercial door and sidelite glass
Tempered and laminated safety glass
Interior partitions, mirrors, and feature glazing
Emergency make-safe and temporary protection
Our scope Coordinated delivery
Confirm dimensions, thickness, make-up, coating, tint, pattern, safety markings, spacer, framing, gaskets, and sealants.
Stabilize damaged areas, control debris, provide temporary boarding or protection, and establish safe public routes.
Remove the failed unit, prepare the frame, install compatible blocks, gaskets and seals, and set the new glass to required clearances.
Check alignment, edge support, seals, drainage, appearance, operation, labels, and cleanliness before reopening the area.
Our process Clear from the start
Review the opening safely and capture the information needed to reproduce the required glass and installation method.
Confirm make-up and lead time, coordinate samples or colour matching where needed, and plan access and temporary protection.
Control the work zone, remove and dispose of damaged glass, prepare the system, and install the replacement unit.
Complete perimeter seals, clean the glazing and frames, test operable units, and remove protection after inspection.
Technical considerations No hidden handoffs
Safety glazing, heat treatment, laminated interlayers, coatings, tint, bird-friendly patterns, and visual matching
Frame drainage, setting blocks, bite, edge clearances, gaskets, sealants, compatibility, and thermal movement
Swing stages, lifts, sidewalk protection, interior access, tenant security, glass weight, and weather
Frequently asked Practical answers
A fogged insulated-glass unit normally indicates a failed edge seal. The frame may be reusable, but the sealed glass unit generally requires replacement.
The goal is a close match, but coatings, tint, age, viewing angle, and discontinued products can create variation. Samples or temporary comparison panels may be useful on sensitive façades.
Yes. The immediate scope can include securing the area, removing unstable pieces, boarding or temporarily protecting the opening, measuring, and arranging permanent replacement.
Have a property improvement in mind?